The production operations of the sliding vane pump cover are as follows:
1. Preparations (pump cover)
1.1 The operator should wear protective labor protection equipment.
1.2 Check the condition of lathe, milling machine and drilling machine.
1.3 Place the workpiece in a suitable area.
2. Lathe machining process
2.1 Fix the workpiece firmly
2.2 Choose suitable cutting tools and measuring tools.
2.3 Processing according to the tolerance requirements of the drawings.
3. Drilling machine processing
3.1 Clamp the turned workpiece firmly
3.2 Choose suitable drill bits and measuring tools.
3.3 Process according to the requirements of the drawings.
4. Tapping processing
4.1 Clamp the large cover with holes firmly
4.2 Choose suitable taps and measuring tools.
4.3 Processing according to the requirements of the drawings.